Previous jobs Control Tower adequacy of the C.A.R. La Cartuja rowing and canoe

Reform consisting of partial demolition of the existing structure and increased in height by pillars and forged metal beams and decking. glass enclosures and access platforms for maintenance.

Elevator installation in the former location of a spiral staircase, and the execution of other external staircase with metal enclosures Pyrox. Construction of a new adjacent room one floor of mixed structure, steel columns and concrete beams. Forging is unidirectional concrete slabs.