Docking project at the “Sagrado Corazón” dam at the port of Tarifa

The project involves removal of concrete blocks and sanitizing of the dock, with later backfill of D-400 concrete. Docking foot repair continues along 140 m in the dock. For sanitizing the bottom of the docking the intervention of machinery with special dimensions was needed, given the complexity of the work.