Crown Cork factory at industrial park “Carretera de la Isla”

A building for manufacture and storage of metal packaging (13,000 m2) and office building area developed on two floors (1,500 m2). Foundation: an area founded with on site piles and pile caps in offices. The rest with surface foundation with footings and braces of reinforced concrete. Concrete floor in office and plant, and concrete slab in the coil storage area. Structure: metallic with variable section porch, fire protected with fireproof paint in plant and rock wool projection in office. Cover: “on site” sandwich.